Description
- Estimated Engineering Cost: $1,189,631.78
- Contractor Cost: TBD
- List of Project Streets
- Interactive Projects Map
What work is being performed?
- Roadways will be completely reconstructed to address the subgrade failure.
- Catch basins and storm water pipe will be installed to improve and address drainage issues.
- Curb and gutter will be removed and replaced, as needed, to address drainage issues.
- Sidewalks will be removed and replaced, as needed, to address safety issues and to ensure compliance with ADA standards.
- ADA ramps will be installed to meet Federal ADA standards.