Description
- Estimated Engineering Cost: $1,704,897.60
- Contractors Cost: $1,588,084.10
- Interactive Projects Map
What work is being performed?
- Curb and gutter will be removed and replaced, as needed, to address drainage issues.
- Sidewalks will be removed and replaced, as needed, to install the new curb and gutter, to address safety issues, and to ensure compliance with ADA standards.
- ADA ramps will be installed to meet Federal ADA standards.
- Catch basins and storm water pipe will be installed to improve and address drainage issues.
- Roadway will be completely reconstructed to address subgrade failure.