Water
Each April 1 Resolution charges for Service Connection Installation Charges, Temporary Services, Water Fill Stations, Meter Removal / Reinstallation, Payment of Charges, Cross Connections, and Tampering or By-Passing Service shall be adjusted by an amount equal to the year to year percentage change in the Engineering News Record (ENR) Construction Cost (20-city average) Index as of December of the preceding calendar year.
Sewer
Each April 1 Resolution charges for Septic Waste and Fats, Oil, Grease (FOG) and Resource Recovery Facility Lab Fees shall be adjusted by an amount equal to the year to year percentage change in the Engineering News Record (ENR) Construction Cost (20-city average) Index as of December of the preceding calendar year. The billing rate will be the adjusted rate rounded to the nearest $0.05.
Street Maintenance
Each April 1 Resolution charges for Street Maintenance Utility Fee Charges shall be adjusted by an amount equal to the year to year percentage change in the Engineering News Record (ENR) Construction Cost (20-city average) Index as of December of the preceding calendar year. The billing rate will be the adjusted rate rounded to the nearest $0.05.
April 2025 Rates | |||||
Single Family base rate within City Limits | |||||
Water | 39.25 | ||||
Sewer | 56.4 | ||||
Public Safety Eq. Charge | 3.45 | ||||
Street Maintenance Fee | 10.15 | ||||
Total | 109.25 | ||||
Usage rates within City Limits | |||||
First 19 units: | 2.45 | per unit | |||
20 units to 149 units: | 2.7 | per unit | |||
150 units or more: | 2.85 | per unit | |||
Single Family base rate Out of City Limits | |||||
Water | 58.85 | ||||
Sewer | 84.7 | ||||
Public Safety Eq. Charge | 3.45 | ||||
Total | 147 | ||||
Usage rates Outside City Limits | |||||
First 19 units: | 3.8 | per unit | |||
20 units to 149 units: | 4.2 | per unit | |||
150 units or more: | 4.5 | per unit | |||
Tampering Fee | 123.9 | ||||
Shut-off for non pay | 59.8 | ||||
Reconnection/ Disconnect Fee | 49.8 | ||||
Overtime | 69.7 | ||||
Doorhanger Fee | 19.9 | ||||
Late Fee | 7.75 |