Bid/RFP Status
Awarded
Bid/RFP Due Date
Bid/RFP Awarded To
Michael A Becker General Contractor
Engineer's estimate: $214,000
This Project consists of the following work for the Wastewater Treatment Resource Recovery Facility Chlorination System Conversion:
1. Construct a block building addition with removable steel roof.
2. Install new 8,000-gallon storage tank and metering pumps.
3. Perform additional and incidental work as called for in the Technical Specifications and Drawings.